Within 60 days after the end of the application period described in paragraph (3)(A), the Secretary, after consultation with the Administrator of the Environmental Protection Agency, shall designate qualified green building and sustainable design projects. At least one of the projects designated shall be located in, or within a 10-mile radius of, an empowerment zone as designated pursuant to section
1391, and at least one of the projects designated shall be located in a rural State. No more than one project shall be designated in a State. A project shall not be designated if such project includes a stadium or arena for professional sports exhibitions or games.