As part of the program under this section, not later than 180 days after December 19, 2007, the Administrator shall establish, using available appropriations and programs implementing sections
432 and
525 (and amendments made by those sections), a cost-effective lighting technology and geothermal heat pump technology acceleration program to achieve maximum feasible replacement of existing lighting, heating, cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies in each GSA facility. Such program shall fully comply with the requirements of sections
321 through
324,
431 through
438,
461,
511 through
518, and
523 through
525 and amendments made by those sections and any other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy savings than required by this section.